Generation
Installation Date:
To interconnect the networks of Ghana, Burkina Faso and Mali.
Transmission
Installation Date:
05.01.2016
To augment transmission capacity for power exchange between Côte d
Others
Installation Date:
To augment the hydropower capacity of Togo and Benin.