![](http://pipes.ecowapp.org/sites/default/files/styles/taille_1/public/powergrid_6.jpg?itok=MgUYA0dI)
The project envisages the development of a scalable, multi-site, multi
![](http://pipes.ecowapp.org/sites/default/files/styles/taille_1/public/powergrid_5.jpg?itok=tJmyV9UY)
The project envisages the development of a scalable, multi-site, multi
![](http://pipes.ecowapp.org/sites/default/files/styles/taille_1/public/nigeria.png?itok=NaIldgDe)
The project is part of the WAPP Transversal Backbone that shall span f
![](http://pipes.ecowapp.org/sites/default/files/styles/taille_1/public/guniea.png?itok=8DxqXor4)
The project envisages the construction of a 225 kV double circuit high
![](http://pipes.ecowapp.org/sites/default/files/styles/taille_1/public/powergrid.jpg?itok=fn7Bguxf)
The project envisions the construction of approximately 650 km of high
![](http://pipes.ecowapp.org/sites/default/files/styles/taille_1/public/7_3.jpg?itok=kK6kFXhY)
To augment power generation capacity in Sierra Leone.