Installation Date:
The project envisages the development of a scalable, multi-site, multi
Installation Date:
The project envisages the development of a scalable, multi-site, multi
Installation Date:
The project is part of the WAPP Transversal Backbone that shall span f
Installation Date:
The project envisages the construction of a 225 kV double circuit high
Installation Date:
07.21.2021
The project envisions the development of a scalable, multi-site, multi
Installation Date:
07.05.2021
The project envisions the construction of approximately 650 km of high
Installation Date:
01.27.2016
To interconnect the networks of
Guinea and Mali
Installation Date:
12.16.2014
To establish a Regional Grid
Emission Factor for WAPP
interconnected
Installation Date:
To prepare the 450 MW
WAPP Maria Gleta & Dumunli
Power Project f