To secure Technical Advisory
Support
To establish a Regional Grid
Emission Factor for WAPP
interconnected
To prepare the 450 MW
WAPP Maria Gleta & Dumunli
Power Project f
To prepare Detailed Engineering
Design on preparation of bidding
Doc
To prepare Detailed Engineering
Design on preparation of bidding
Doc
To study the environnemental
and social impact assessment
and the re
To recruit Owner's Engineer to
support WAPP on Phase 1