Skip to main content
Toggle navigation
Search form
Search
Ecowapp
icc
en
fr
Go
Home
About PIPES
Contact
Financing requirement
For Implementation
For Preparatory Studies
On Going Projects
Under Implementation
Under Preparation
Finalised Projects
Events
Strategic documents
Project Reports
Planning, Investment Programming and Environmental Safeguards
Read More About PIPES
Planning, Investment Programming and Environmental Safeguards
Read More About PIPES
Types
Generation
Others
Transmission
Status
Financing requirement
-For Preparatory Studies
-For Implementation
On Going Projects
-Under Preparation
-Under Implementation
Finalised Projects
Country
Afghanistan
Bu
Burkina-faso
Cote d'Ivoire - Liberia - S.Leone - Guinea
Ghana - Burkina Faso
Guinea Interconnection
S.Leone
Togo - Ghana
Guinea Bissau
Albania
Algeria
Andorra
Angola
Antigua and Barbuda
Argentina
Armenia
Australia
Austria
Azerbaijan
Bahamas
Bahrain
Bangladesh
Barbados
Belarus
Belgium
Belize
Benin
Bhutan
Bolivia
Bosnia and Herzegovina
Botswana
Brazil
Brunei
Bulgaria
Burkina Faso
Burundi
Cabo Verde
Cambodia
Cameroon
Canada
Central African Republic (CAR)
Chad
Chile
China
Colombia
Comoros
Costa Rica
Cote d'Ivoire
Croatia
Cuba
Cyprus
Czech Republic
Democratic Republic of the Congo
Denmark
Djibouti
Dominica
Dominican Republic
Ecuador
Egypt
El Salvador
Equatorial Guinea
Eritrea
Estonia
Ethiopia
Fiji
Finland
France
Gabon
Gambia
Georgia
Germany
Ghana
Ghana - Burkina Faso - Mali
Greece
Grenada
Guatemala
Guinea
Guinea-Bissau
Guyana
Haiti
Honduras
Hungary
Iceland
India
Indonesia
Iran
Iraq
Ireland
Israel
Italy
Jamaica
Japan
Jordan
Kazakhstan
Kenya
Kiribati
Kosovo
Kuwait
Kyrgyzstan
Laos
Latvia
Lebanon
Lesotho
Liberia
Libya
Liechtenstein
Lithuania
Luxembourg
Switzerland
Syria
Sweden
Swaziland
Suriname
Taiwan
Tajikistan
Togo
Togo - Benin
Timor-Leste
Thailand
Tanzania
Sudan
Sri Lanka
Slovakia
Slovenia
Singapore
Sierra Leone
Seychelles
Solomon Islands
Somalia
Spain
South Sudan
South Korea
South Africa
Togo/Benin
Tonga
Vietnam
Yemen
Venezuela
Vatican City (Holy See)
Vanuatu
Zambia
Uzbekistan
Uruguay
Turkmenistan
Tuvalu
Turkey
Tunisia
Trinidad and Tobago
Uganda
Ukraine
United States of America (USA)
United Kingdom (UK)
United Arab Emirates (UAE)
undefined
Serbia
Senegal
Morocco
Mozambique
Montenegro
Mongolia
Monaco
Myanmar (Burma)
Namibia
New Zealand
Nicaragua
Netherlands
Nepal
Nauru
Moldova
Micronesia
Maldives
Mali
Malaysia
Malawi
Madagascar
Mali - Burkina Faso
Malta
Mexico
Mauritius
Mauritania
Marshall Islands
Niger
Nigeria
Russia
Rwanda
Romania
Republic of the Congo
Qatar
Saint Kitts and Nevis
Saint Lucia
Sao Tome and Principe
Saudi Arabia
San Marino
Samoa
Saint Vincent and the Grenadines
Portugal
Poland
Pakistan
Palau
Oman
Norway
North Korea
Palestine
Panama
Philippines
Peru
Paraguay
Papua New Guinea
Macedonia
Zimbabwe
Search
Search by keyword
Popular searches :
Activities
Electrecity
Events
Interconnexion
Pipes
Reports
Risks
Financing requirement
See all projects
For Implementation
For Preparatory Studies
Generation
150 MW WAPP Regional Solar Power Park in Burkina Faso
The project envisions the development of a scalable, multi-site, multi
Others
225 kV Guinea - Mali Interconnection Project
To interconnect the networks of Guinea and Mali
Others
WAPP Grid Emission Factor (GEF)
To establish a Regional Grid Emission Factor for WAPP interconnected
Generation
150 MW WAPP Regional Solar Power Park in Togo
The project envisages the development of a scalable, multi-site, multi
Generation
150 MW WAPP Regional Solar Power Park in Benin
The project envisages the development of a scalable, multi-site, multi
Transmission
Nigeria – Benin – Togo – Ghana - Côte d'Ivoire Interconnection Project: WAPP Median Backbone
The project is part of the WAPP Transversal Backbone that shall span f
On Going Projects
See all projects
Projects Under Preparation
Projects Under Implementation
Generation
2nd Hydropower Project On St. Paul River in Liberia
Expected Commissioning Date :
The project involves the implementation of a 2nd hydropower project on
Generation
150 MW WAPP Regional Solar Power Park in the Gambia
Expected Commissioning Date :
The project envisages the development of a scalable, multi-site, multi
Generation
150 MW WAPP Regional Solar Power Park in Mali
Expected Commissioning Date :
The project envisages the development of a scalable, multi-site, multi
Generation
150 MW WAPP Regional Solar Power Park in Niger
Expected Commissioning Date :
The project envisages the development of a scalable, multi-site, multi
Transmission
Côte d'ivoire – Burkina Interconnection Reinforcement Project
Expected Commissioning Date :
The project envisions the construction of a second interconnector betw
Generation
150 MW WAPP Regional Solar Power Park in Burkina Faso
Expected Commissioning Date :
01.01.2017
To develop a Regional solar park in Burkina Faso.
Finalised Projects
See all projects
450 MW Souapiti Hydropower Facility in Guinea
Commissioned Date :
The project involved the development of a hydropower facility on the Konkoure River in Guinea, about 135 km from the capital Conakry, as part of a...
Read More
240 MW Kaleta hydropower plant
Commissioned Date :
09.28.2015
To augment hydro power capacity of the OMVG power system
Read More
OMVS 60 MW Félou Hydro Power Project
Commissioned Date :
To augment hydropower capacity of the OMVS power system
Read More
Cross Border Supply of Electricity to Rural Communities in Southern Togo from Ghana
Commissioned Date :
03.10.2015
To increase access to energy to border communities in Togo from Ghana.
Read More
Cross Border Supply of Electricity to Rural Communities in Northern Togo from Benin
Commissioned Date :
03.10.2016
To increase access to energy to border communities in Togo from Benin.
Read More
50 MW Bumbuna Hydropower Project
Commissioned Date :
To augment Hydropower capacity in Sierra Leone
Read More
Useful information
About Pipes
The implementation of priority investment programmes is coordinated by the WAPP Secretariat through the PIPES Department,...
Read More
The Strategic Planning and Environment Committee
The Strategic Planning and Environment Committee (SPEC) shall be comprised of eleven representatives.
Read More
Strategic Documents
Business Plan
The West African Power Pool (WAPP) is a specialized institution of ECOWAS covering 14 out of the 15
1.89 MB
01.01.2012
Download
Master Plan
Updating of the Revised Master Plan for the Electricity Generation and Transmission Equipment of ECOWAS
Final Report Tome 1: Study Data
Final Report Tome 2: Optimal devel
Read More
Technical And Financial Partners