150 MW WAPP Regional Solar Power Park in Burkina Faso

Installation date: 
01.01.2017
Generation
Objective
To develop a Regional solar park in Burkina Faso.
Project Status
ToR for Prefeasibility Study has been prepared and funding secured from the European Union within the framework of the EU Resident Technical Assistance to the WAPP. The final report on the study is expected to be submitted in January 2017
Follow up Actions Required
WAPP to conclude the preparation of the Prefeasibility Study.
useful information
Type of StudyPre-Feaibility Studies
Cost of Study (US$ thousands)206
Funds Secured (US$ thousands)206
Funding SourcesEU