Installation Date:
To study the environnemental
and social impact assessment
and the re
Installation Date:
To recruit Owner's Engineer to
support WAPP on Phase 1
Installation Date:
Reconstruction of hydropower
and transmission facilities to
restore
Installation Date:
To augment power generation capacity in Sierra Leone.
Installation Date:
To interconnect the networks of Côte d'Ivoire - Liberia - S.Leone
Installation Date:
To reinforce the Côte d'Ivoire network to enable it support power
Installation Date:
To close northern transmission loop in Ghana as pre-condition for Ghan
Installation Date:
The project envisions the construction of a 330 kV double circuit high
Installation Date:
To interconnect the networks of Ghana, Burkina Faso and Mali.