Transmission
Installation Date:
To study the environnemental and social impact assessment and the re
Others
Installation Date:
To recruit Owner's Engineer to support WAPP on Phase 1
Others
Installation Date:
Reconstruction of hydropower and transmission facilities to restore
Generation
Installation Date:
To augment power generation capacity in Sierra Leone.
Generation
Installation Date:
To interconnect the networks of Côte d'Ivoire - Liberia - S.Leone
Transmission
Installation Date:
To reinforce the Côte d'Ivoire network to enable it support power
Transmission
Installation Date:
To close northern transmission loop in Ghana as pre-condition for Ghan
Generation
Installation Date:
To interconnect the networks of Ghana, Burkina Faso and Mali.
Transmission
Installation Date:
05.01.2016
To augment transmission capacity for power exchange between Côte d