Installation Date:
To develop and establish the
project's institutional
framework
Installation Date:
Reconstruction of hydropower
and transmission facilities to
restore
Installation Date:
To augment power generation capacity in Sierra Leone.
Installation Date:
To interconnect the networks of Côte d'Ivoire - Liberia - S.Leone
Installation Date:
To reinforce the Côte d'Ivoire network to enable it support power
Installation Date:
To close northern transmission loop in Ghana as pre-condition for Ghan
Installation Date:
Refurbishment of hydropower facilities to improve delivery of auxillar
Installation Date:
10.24.2016
Feasibility Update + ESIA Update + Bidding
Installation Date:
To interconnect the networks of Ghana, Burkina Faso and Mali.