330 kV Côte d’Ivoire - Ghana Interconnection Reinforcement Project

Transmission
Description
The project envisages the construction of a 330 kV double circuit high voltage transmission line of approximate length 296 km, with associated substations, that shall emanate from Dunkwa 2 in Ghana to Akoupé-Zeudji in Côte d’Ivoire.
Objective
To augment transmission capacity for power exchange between Côte d'Ivoire and Ghana and beyond.
Project Status
Pre-investment studies that were funded by the EU-Africa Infrastructure Trust Fund (EU-A ITF) through the EIB and KfW were completed in 2014. Due to a change in the implementation strategy, the project is now being implemented in phases with the 1st phase being the Akoupé-Zeudji – Bingerville segment in Côte d’Ivoire and being financed by KfW as well as CI-ENERGIES. The 1st phase of the project is envisaged to be commissioned in 2024.
Useful Information
Preparation
Funding Secured (US$)2 365 000
Funding Gap (US$)-
Funding SourcesEU-A ITF
Implementation
Funding Secured (EUR)36 700 000
Funding Gap (EUR)-
Funding SourcesKfW, CI-ENERGIES