
To augment transmission capacity
in Ghana

To provide emergency support
to the power sector in Siera
Leone

To prepare Detailed Engineering
Design on preparation of bidding
Doc

To augment the power generation
capacity of the sub-region.

To interconnect the national networks of Ghana Benin and Togo

To augment hydropower capacity of the OMVS power system.

To improve delivery of ancillary
services and sub-regional system
ba

The project envisages the construction of a 330 kV double circuit high